2017 Road Infrastructure Work
The Town plans to spend approximately $1.15 million in road rehabilitation in 2017. The following locations are scheduled for asphalt resurfacing and sidewalk concrete:
• 6th Avenue West (asphalt and sidewalk)
• 12th Avenue East (asphalt)
• Intersection of Main Street and Railway Avenue
• Various sidewalk portions throughout town
In addition, paving will take place at the Kindersley Regional Airport. A budget of $116,600 has been allocated toward paving of the Helipad Access and Taxi C.
The Town’s Long-term Infrastructure Plan assesses the condition of all road surfaces, rating such components as road cracking, ruts, and curb and gutter safety on a scale of poor to good. The condition of adjoining infrastructure such as water, stormwater and sanitary sewer pipes and valves is also factored into the projected work plan. The Town of Kindersley has a total of 75 kilometres of paved road surface.
Private property including parking lots and mobile home estates is the responsibility of the property or landowner to repair and maintain the roads. The Ministry of Highways is responsible for paving the approaches off of Highway 7 and 21.
2017 sidewalk work will include the construction of wheelchair access ramps and several portions of sidewalk.
Wheelchair Ramps
1st Street West/ Railway Ave |
3rd St W /1st Ave W |
Railway Ave /1st Ave W |
2nd St E x 4th Ave E |
2nd Ave E and 2nd St E, NW & SW corners |
Sidewalk Panels
1007-2nd St W (3+2 panels) | 5 Panels |
400-3rd St W | 2 Panels |
O Connor court-sidewalk needs to be replaced (Gary Gassner-phone Message) | 10 Panels |
109-113-2nd Ave E – Provincial Building – Roland 306-460-7917 | 7 Panels |
400-2nd Street East – Arena near north entrance along 2nd Street East | 2 P at park side |
600 – 2nd St East | 2 Panels. |
319 -1st Ave W 2 panels | 2 Panels. |
212,214,216 -1st Ave W | 10 Panels. |
202-1st Ave E | 3 Panels |
313-2nd Ave W | 2 Panels + C&G |
In front of 412, @ 3rd Ave W | 3 Panels |
311-2nd Ave W | 4 Panels |
In front of 302, 3rd Ave W | 2Panels |
Main St. Project PV Mart | 20 Panels |
8-15 Stevenson court | 10 panels |
63 O corner Cres Corner | 3 Panels |
2nd St E(200). Mc Gowen Park | 4 Panels |
307-1st Ave West | 3 Panels |
300 – 2nd Street /main street coop pharmacy | 3 Panels |
Sign up for E-Updates Now to Stay Informed
By submitting this form, you are granting the Town of Kindersley (106 5th Avenue East, Kindersley, Saskatchewan, Canada, www.kindersley.ca) permission to email you. You can revoke this permission at any time using the unsubscribe from this list link found at the bottom of every email. Emails are serviced by MailChimp. This disclaimer is provided in accordance with Canada’s Anti-Spam Legislation (CASL).